Do i need a licensed asbestos contractor (2 figures)

The Removal Work Class Rules carries 2 published figures read from 2 sources' own pages, from 14 to 28 day, read 11 September 2026.

14 to 28 day Range of the published figures 2 published figures, not one market: read the rows
2 Published figures from 2 source pages, read 18 Oct 2026
2 of 9 Sources read that publish one 22% publish a figure at all
  1. Control of Asbestos Regulations 2012, regulation 8 (licensing)28 day
  2. Control of Asbestos Regulations 2012, regulation 9 (notification)14 day
Every published figure, highest first.
Table view
RowValue
Control of Asbestos Regulations 2012, regulation 8 (licensing)28 day
Control of Asbestos Regulations 2012, regulation 9 (notification)14 day

2 of the 9 named sources read in full publish a figure; 7 publish none, read 11 September 2026.

By instrument

BreakdownMedianRangeSources
instrumentControl of Asbestos Regulations 2012, regulation 8 licence application period28day28 to 28day1
instrumentControl of Asbestos Regulations 2012, regulation 9 notification period14day14 to 14day1

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
Control of Asbestos Regulations 2012, regulation 8 (licensing)28dayControl of Asbestos Regulations 2012, regulation 8 licence application period2026-09-11
Control of Asbestos Regulations 2012, regulation 9 (notification)14dayControl of Asbestos Regulations 2012, regulation 9 notification period2026-09-11
The sentence each figure was read from (2)

Read in full, publishes no figure

7 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

2 of the 9 named sources that could be read published a usable figure; 7 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source in day (a source's median where its page yielded several accepted sentences), so N counts sources, never sentences; 2 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per material x condition x work: the class the Control of Asbestos Regulations 2012 puts it in (licensed / notifiable non-licensed / non-licensed), the notification period and form, whether a four-stage clearance certificate by a UKAS-accredited analyst is required, the medical and record-keeping duties, and the Northern Ireland equivalent - each read from the regulation or the regulator's own page.

Joined to the price index this is the estate's own finding: the multiple the law itself puts on the bill, per material, which no cost guide derives and no HSE page prices.

2 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (9)
Cite or embed this figure

The Removal Work Class Rules carries 2 published figures read from 2 sources' own pages, from 14 to 28 day, read 11 September 2026.

2 of the 9 named sources read in full publish a figure; 7 publish none, read 11 September 2026.

Removal Work Class Rules, instrument Control of Asbestos Regulations 2012, regulation 8 licence application period: median 28 day across 1 source, read 11 September 2026.

Removal Work Class Rules, instrument Control of Asbestos Regulations 2012, regulation 9 notification period: median 14 day across 1 source, read 11 September 2026.

Cite as: "asbestosremovalcosts.co.uk Removal Work Class Rules", updated 2026-10-18, https://asbestosremovalcosts.co.uk/datasets/removal-work-class-rules/.

Embed this figure (plain HTML, no scripts)

14 to 28 day

2 published figures, Removal Work Class Rules, across 2 sources, read 11 September 2026

Source: asbestosremovalcosts.co.uk Removal Work Class Rules

Machine-readable: JSON, CSV, Markdown.

Download the CSV (2 rows, computed 2026-10-18)

Get removal quotes